SUNY – Farmingdale State College
Address:
Nold Hall Gymnasium Rehabilitation
Farmingdale, NY
Clients:
State University Construction Fund State University Plaza 353 Broadway
Albany, NY 12246
Peter Gisolfi Associates
566 Warburton Ave. Hastings-on-Hudson, NY 10706
Project Size:
94,000 SFConstruction Cost:
$3 Million
The project consists of replacing a synthetic gymnasium track and basketball court floor with a new built-up (2” in thickness) wood sports floor for basketball and a synthetic track surface at the perimeter of the room.
Replace existing manually operated bleachers with new electrically operated bleachers and related modifications.
- Adjust height of all fire alarm devices (previously located 6’-8” above finished floor [AFF]), up to a height of 15’-0” AFF.
- The previously existing six (manual) backboards will be replaced with six new backboards requiring electrical power.
- Extend electric power and data conduits to a new shot clock at each backboard (6 total).
- Extend power and data conduit to the south wall for future scoreboard.
- Coordinate power requirements for new bleachers, demolish existing power for bleachers being removed.
- Extend power and data conduits (data wiring by others) to score keeper location near face of new bleacher.
- Demolish and remove two (2) existing score boards at west wall.
Project Type:
Education | Sports and Entertainment